Company Profile
Products
 
Ultimate Test Criterion
Modified Date2001/12/12Executive Date2002/1/1Reference No.DF-SIP-1003.17Print No.A/3
Battery TypeLR03Discription1.Mercury free battery,W(Hg)≤1×10-4%; 2.Low cadmium battery,W(Cd)≤0.025%
1. Delivery Criterion (Shipment after the following requirement)
No.Test itemQuality CriterionMeasuring Equipment/MethodSampling/determinant method Note
1External Diameter(Φ)9.5-10.5mmThe accuracy of vernier caliper shall be≥0.02mm

GB2828-87,IL=S-3
AQL=0.65

2Total height43.3-44.5mm
3Open circuit voltage1.580-1.650VThe accuracy of the direct voltage meter shall be ≥0.25%, and its internal resistance shall be ≥1MΩ,or digital multimeterGB2828-87,IL=I
AQL=1.0
Measuring environment temperture:20±2°C
4Short circuit current≥7.0A(reference only)0.5 Grade Model C19 Direct Current Meter
5Dischanging time≥100minIDS battery intellegent discharge system, continuous discharge to 0.9V at 3.9Ω,record the discharge time;Continues discharge 48 hours,at 20Ω,then observe the leakage-proof performance by eye.GB/T7112-1998 6.3
6Leakage-proof performanceNo transfiguration,no leakage shall occur.GB2829-87,DL=III
RQL(Ac,Re)=40(1,2)
7Appearance(eye test)

a.Each battery is clear and neat and positive polarity is place in the middle;
b.Integrity & neatness of trademark letters & signs. Uniformity of shrink & metallic jacket;
c.Copper cap & false bottom are clear and neat,with no rust.

GB2828-87, IL=I; AQL=2.5

 

8Packaging(eye test)a.Shirnk tube neat & well; b.Packing cotton,cotton material & printing quality meet requirement.
9Other According to GB/T7112-1998 battery standard.
9Other packaging requirementSales Department check according to Order Packaging Requirement for each order. 
10Order related stock and process inspection are finished and meet requirements.
2. Tracing standard after delivery (at least once per month, not corresponding to order; Shelf life: 3 years)
Item
End-point voltageGB/IEC StandardEnterprise Standard (new battery) ≥2 month≥6 month≥12 month≥18month25-36month
Discharge standard3.9Ω
continuous discharge
0.9V

100min

95min

90min

85min

80min

70min
5.1,1h/d0.9V≥130min≥170min≥165min≥160min≥155min≥150min≥140min
10,1h/d0.8V≥5.0h≥6.5h≥6.2h≥6.0h≥5.8min≥5.5h≥5.0h
75,4h/d0.9V≥48h≥60h≥58h≥55h≥53h≥50h≥48h
3.6,15s/min,24h/d0.9V≥350≥500≥480≥480≥420≥400≥360
Voltage & Current testOpen circuit
voltage(V)
1.500-1.6501.580-1.650≥1.580≥1.560≥1.540≥1.520≥1.500
Short circuit
current(A)
 ≥7.0≥6.8≥6.3≥6.0≥5.0≥4.0
       
3. Routime test item (at least once per month)  
No.ItemTest RequirementTest MethodSampling & determinant method  
1High Temperature TestNo transfiguration, no leakage shall occur. Constant temperature box/Constant temperatur45±2°C, 720hGB2829-87,DL=III
50pcs/time,RQL=5.0
 
 
Suzhou Industial Park East Battery Co.,Ltd.  Tel: 86-512-67540371   E-mail: mail@szebfbattery.com
© 2010 Suzhou Industrial Park East Battery Co., Ltd. All Rights Reserved.